I read Maven Failsafe plugin is designed specifically to run integration tests. Currently I'm working on a multi-module project and integration tests are in its own separate module, written in TestNg and run using Surefire plugin. We don't have conflicts with unit tests since only integration tests are run in the test phase in that module. And to set up the environment before the tests, and clean it after tests are run, @BeforeSuite @AfterSuite
TestNg annotations are used. So there's no need to make use of pre-integration-test
phase, integration-test
phase, post-integration-test
phase utilized by Failsafe plugin.
- Are there any more benefits I'm missing out on, by not using the Failsafe plugin?
- Are there better ways to do my current requirement using Failsafe plugin?
- Can I do my server startup, shut down, file unzipping etc. in the
pre-integration-test
,post-integration-test
phases without writing a maven plugin?
If you already have your own test setup/teardown in your suites, which from the looks of it you do, there is not much you can gain from the FailSafe plugin.
The FailSafe plugin is useful in situations where the Setup of your System Under Test is costly or takes a long time such as starting up a Servlet or a distributed system. The way the FailSafe plugin comes handy in these situations is that you can set up this environment in the
pre-integration-test
phase. This plugin also doesn't stop the execution of the Maven build when a test fails, which allows you to clean up all of your artifacts during thepost-integration-test
phase, after which it checks the status of your tests and passes or fails the build accordingly during theverify
phase.Failsafe has one big feature vs Surefire: When a test fails, it does not immediately abort. Instead it lets the clean-up code run (which typically takes down the Jetty server).
Addressing your third question as it isn't really answered, imho.
Taken from this answer to "Maven Failsafe Plugin: how to use the pre- and post-integration-test phases"
It boils down to:
pre-integration-test
andpost-integration-test
do nothing per default. You can bind a plugin specific for your task to those phases. Finding a specific plugin depends on what you're trying to do.Another important thing to point out is default naming conventions used by the
maven-failsafe-plugin
: It runs test-classes with names starting or ending withIT
(as integration test class)