How do I get my Maven Integration tests to run

2019-01-04 05:12发布

I have a maven2 multi-module project and in each of my child modules I have JUnit tests that are named Test.java and Integration.java for unit tests and integration tests respectively. When I execute:

mvn test

all of the JUnit tests *Test.java within the child modules are executed. When I execute

mvn test -Dtest=**/*Integration

none of the Integration.java tests get execute within the child modules.

These seem like the exact same command to me but the one with the -Dtest=/*Integration** does not work it displays 0 tests being run at the parent level, which there are not any tests

8条回答
爱情/是我丢掉的垃圾
2楼-- · 2019-01-04 05:49

The Maven build lifecycle now includes the "integration-test" phase for running integration tests, which are run separately from the unit tests run during the "test" phase. It runs after "package", so if you run "mvn verify", "mvn install", or "mvn deploy", integration tests will be run along the way.

By default, integration-test runs test classes named **/IT*.java, **/*IT.java, and **/*ITCase.java, but this can be configured.

For details on how to wire this all up, see the Failsafe plugin, the Failsafe usage page (not correctly linked from the previous page as I write this), and also check out this Sonatype blog post.

查看更多
爷、活的狠高调
3楼-- · 2019-01-04 05:52

I have done EXACTLY what you want to do and it works great. Unit tests "*Tests" always run, and "*IntegrationTests" only run when you do a mvn verify or mvn install. Here it the snippet from my POM. serg10 almost had it right....but not quite.

  <plugin>
    <!-- Separates the unit tests from the integration tests. -->
    <groupId>org.apache.maven.plugins</groupId>
    <artifactId>maven-surefire-plugin</artifactId>
    <configuration>
       <!-- Skip the default running of this plug-in (or everything is run twice...see below) -->
       <skip>true</skip>
       <!-- Show 100% of the lines from the stack trace (doesn't work) -->
       <trimStackTrace>false</trimStackTrace>
    </configuration>
    <executions>
       <execution>
          <id>unit-tests</id>
          <phase>test</phase>
          <goals>
             <goal>test</goal>
          </goals>
          <configuration>
                <!-- Never skip running the tests when the test phase is invoked -->
                <skip>false</skip>
             <includes>
                   <!-- Include unit tests within integration-test phase. -->
                <include>**/*Tests.java</include>
             </includes>
             <excludes>
               <!-- Exclude integration tests within (unit) test phase. -->
                <exclude>**/*IntegrationTests.java</exclude>
            </excludes>
          </configuration>
       </execution>
       <execution>
          <id>integration-tests</id>
          <phase>integration-test</phase>
          <goals>
             <goal>test</goal>
          </goals>
          <configuration>
            <!-- Never skip running the tests when the integration-test phase is invoked -->
             <skip>false</skip>
             <includes>
               <!-- Include integration tests within integration-test phase. -->
               <include>**/*IntegrationTests.java</include>
             </includes>
          </configuration>
       </execution>
    </executions>
  </plugin>

Good luck!

查看更多
登录 后发表回答