I am trying to get a Date range for all workdays this week. I have written the following code to do so.
Code
$begin = new DateTime('monday this week'); 2016-07-04
$end = clone $begin;
$end->modify('next friday'); // 2016-07-08
$interval = new DateInterval('P1D');
$daterange = new DatePeriod($begin, $interval, $end);
foreach($daterange as $date) {
echo $date->format('Y-m-d')."<br />";
}
Output
- 2016-07-04
- 2016-07-05
- 2016-07-06
- 2016-07-07
In the output friday is missing. I can fix this by doing $end->modify('next saturday')
but I was wondering why the last day of a DatePeriod
is not included in the range.
The iterator seems to check the time as well as the date, it excludes the end element if the time in the endDate is less that or equal to the time in the start date.
So ensure the time of the end date is at least a second greater that that of the start date.
Try this code