可以将文章内容翻译成中文,广告屏蔽插件可能会导致该功能失效(如失效,请关闭广告屏蔽插件后再试):
问题:
I have written the following code to find days between two dates
startDateValue = new Date(startDate);
endDateValue = new Date(endDate);
long diff = endDateValue.getTime() - startDateValue.getTime();
long seconds = diff / 1000;
long minutes = seconds / 60;
long hours = minutes / 60;
long days = (hours / 24) + 1;
Log.d("days", "" + days);
When start and end date are 2/3/2017 and 3/3/2017 respectively the number of days showing is 29.Though when they are of the same day it is showing 1.(The number of days one takes a leave.So if one takes a single day leave,he has to select same start and end date.So in this case he has taken two days leave).
What am I doing wrong?
Thank you for your time.
Note: Please don't use the date constructor. Check the accepted answer below. Use simpledateformat or Joda time. Date constructor is deprecated.
回答1:
Your code for generating date object:
Date date = new Date("2/3/2017"); //deprecated
You are getting 28 days as answer because according to Date(String)
constructor it is thinking day = 3,month = 2 and year = 2017
You can convert String to Date as follows:
String dateStr = "2/3/2017";
SimpleDateFormat sdf = new SimpleDateFormat("dd/MM/yyyy");
Date date = sdf.parse(dateStr);
Use above template to make your Date object. Then use below code for calculating days in between two dates. Hope this clear the thing.
It can de done as follows:
long diff = endDateValue.getTime() - startDateValue.getTime();
System.out.println ("Days: " + TimeUnit.DAYS.convert(diff, TimeUnit.MILLISECONDS));
Please check link
If you use Joda Time it is much more simple:
int days = Days.daysBetween(date1, date2).getDays();
Please check JodaTime
How to use JodaTime in Java Project
回答2:
public static int getDaysDifference(Date fromDate,Date toDate)
{
if(fromDate==null||toDate==null)
return 0;
return (int)( (toDate.getTime() - fromDate.getTime()) / (1000 * 60 * 60 * 24));
}
回答3:
What date format do you use? Is it d/M/yyyy
or M/d/yyyy
?
d = day, M = month, yyyy = year
(see: https://developer.android.com/reference/java/text/SimpleDateFormat.html)
Then the codes:
public static final String DATE_FORMAT = "d/M/yyyy"; //or use "M/d/yyyy"
public static long getDaysBetweenDates(String start, String end) {
SimpleDateFormat dateFormat = new SimpleDateFormat(DATE_FORMAT, Locale.ENGLISH);
Date startDate, endDate;
long numberOfDays = 0;
try {
startDate = dateFormat.parse(start);
endDate = dateFormat.parse(end);
numberOfDays = getUnitBetweenDates(startDate, endDate, TimeUnit.DAYS);
} catch (ParseException e) {
e.printStackTrace();
}
return numberOfDays;
}
And for getUnitBetweenDates
method:
private static long getUnitBetweenDates(Date startDate, Date endDate, TimeUnit unit) {
long timeDiff = endDate.getTime() - startDate.getTime();
return unit.convert(timeDiff, TimeUnit.MILLISECONDS);
}
回答4:
Kotlin
Here is the example to calculate days from today to some date:
val millionSeconds = yourDate.time - Calendar.getInstance().timeInMillis
leftDays.text = TimeUnit.MILLISECONDS.toDays(millionSeconds).toString() + "days"
If you want to calculate two days, then change:
val millionSeconds = yourDate1.time - yourDate2.time
should work.
回答5:
Does Android
fully support java-8
? If yes you can simple use ChronoUnit
class
LocalDate start = LocalDate.of(2017,2,3);
LocalDate end = LocalDate.of(2017,3,3);
System.out.println(ChronoUnit.DAYS.between(start, end)); // 28
or same thing using formatter
DateTimeFormatter formatter = DateTimeFormatter.ofPattern("M/d/yyyy");
LocalDate start = LocalDate.parse("2/3/2017",formatter);
LocalDate end = LocalDate.parse("3/3/2017",formatter);
System.out.println(ChronoUnit.DAYS.between(start, end)); // 28
回答6:
Have look at this code , this is helpful for me ,hope it will help you.
public String get_count_of_days(String Created_date_String, String Expire_date_String) {
SimpleDateFormat dateFormat = new SimpleDateFormat("dd/MM/yyyy", Locale.getDefault());
Date Created_convertedDate = null, Expire_CovertedDate = null, todayWithZeroTime = null;
try {
Created_convertedDate = dateFormat.parse(Created_date_String);
Expire_CovertedDate = dateFormat.parse(Expire_date_String);
Date today = new Date();
todayWithZeroTime = dateFormat.parse(dateFormat.format(today));
} catch (ParseException e) {
e.printStackTrace();
}
int c_year = 0, c_month = 0, c_day = 0;
if (Created_convertedDate.after(todayWithZeroTime)) {
Calendar c_cal = Calendar.getInstance();
c_cal.setTime(Created_convertedDate);
c_year = c_cal.get(Calendar.YEAR);
c_month = c_cal.get(Calendar.MONTH);
c_day = c_cal.get(Calendar.DAY_OF_MONTH);
} else {
Calendar c_cal = Calendar.getInstance();
c_cal.setTime(todayWithZeroTime);
c_year = c_cal.get(Calendar.YEAR);
c_month = c_cal.get(Calendar.MONTH);
c_day = c_cal.get(Calendar.DAY_OF_MONTH);
}
/*Calendar today_cal = Calendar.getInstance();
int today_year = today_cal.get(Calendar.YEAR);
int today = today_cal.get(Calendar.MONTH);
int today_day = today_cal.get(Calendar.DAY_OF_MONTH);
*/
Calendar e_cal = Calendar.getInstance();
e_cal.setTime(Expire_CovertedDate);
int e_year = e_cal.get(Calendar.YEAR);
int e_month = e_cal.get(Calendar.MONTH);
int e_day = e_cal.get(Calendar.DAY_OF_MONTH);
Calendar date1 = Calendar.getInstance();
Calendar date2 = Calendar.getInstance();
date1.clear();
date1.set(c_year, c_month, c_day);
date2.clear();
date2.set(e_year, e_month, e_day);
long diff = date2.getTimeInMillis() - date1.getTimeInMillis();
float dayCount = (float) diff / (24 * 60 * 60 * 1000);
return ("" + (int) dayCount + " Days");
}
回答7:
Very simple, just use Calendar, create two instances for the two dates, convert to milliseconds, subtract and convert to days (rounded up)... like this, basically:
Calendar startDate = Calendar.getInstance();
startDate.set(mStartYear, mStartMonth, mStartDay);
long startDateMillis = startDate.getTimeInMillis();
Calendar endDate = Calendar.getInstance();
endDate.set(mEndYear, mEndMonth, mEndDay);
long endDateMillis = endDate.getTimeInMillis();
long differenceMillis = endDateMillis - startDateMillis;
int daysDifference = (int) (differenceMillis / (1000 * 60 * 60 * 24));
回答8:
Be carefur if you'd like to use received integer e.g. to indicate specific day in custom calendar implementation. For example, I tried to go in m app from monthly calendar view to daily view and show daily content, by calculating dates from 1970-01-01 to selected one, and each 25-31th day of month shows me as one day earlier, because datesDifferenceInMillis / (24 * 60 * 60 * 1000);
may return something like 17645,95833333333, and casting this to int you'll get value lower by 1. In this case correctly number of days you'll get by rounding received float by using NumberFormat class. Here's my code:
NumberFormat numberFormat = NumberFormat.getInstance(Locale.getDefault());
numberFormat.setRoundingMode(RoundingMode.HALF_UP);
numberFormat.setMaximumFractionDigits(0);
numberFormat.setMinimumFractionDigits(0);
int days = numberFormat.parse(numberFormat.format(value)).intValue();
I hope it will be helpful.